01 / A senior role to cover
A departure, a recruitment under way or an incomplete team. AD SEN Embedded takes on the agreed role and keeps decisions on track until the permanent lead arrives.
Vacancy · Design management · Client reporting · Handover
Aller au contenu
A lead leaves. A project is awarded before the team is complete. Decisions pile up. Design work continues — but the project’s direction can start to blur.
AD SEN Embedded places a senior architect inside your organisation, client-side or within the design team, to read the situation quickly, set priorities, lead design coordination and prepare a clear handover.
Assignments of 1 to 6 months, usually 2 to 4.
Across RIBA Stages 1–5 / Embedded design leadership
Design management, independent design review and project recovery, from briefing to construction. For decisions taken further upstream,
02 — Three situations
01 / A senior role to cover
A departure, a recruitment under way or an incomplete team. AD SEN Embedded takes on the agreed role and keeps decisions on track until the permanent lead arrives.
Vacancy · Design management · Client reporting · Handover
02 / A project getting under way
The permanent team is still forming. AD SEN Embedded sets up design governance from day one: brief, responsibilities, programme, decision milestones.
Mobilisation · Brief review · Responsibility matrix · Design programme
03 / A project to get moving again
When decisions stall, interfaces become unclear or changes accumulate, AD SEN Embedded reads the project situation, identifies the critical issues and establishes a recovery path
Recovery · Diagnosis · Risk & change · Recovery roadmap
03 — Role & deliverables
01 /
Lead consultants, interfaces and the design programme within the agreed mandate.
02 /
Read design proposals against client requirements, cost and programme.
03 /
Prepare trade-offs, track decisions, risks and changes, and report to the client.
Project Situation Report
Responsibility Matrix
Design Programme
Decision Register
Risk & Change Registers
Client Reporting
AD SEN Handover Pack
Also known as: Interim Senior Design Manager · Client-side Architect · Design Review Consultant · Owner’s Representative — Design · Project Recovery Lead
04 — Our approach
Scope, role and deliverables are agreed at the outset. Handover is prepared from day one.
01 /
Review the brief, design work, contracts and programme. Identify open decisions and critical points.
02 /
Clarify priorities, responsibilities and interfaces. Set up registers and approval routes.
03 /
Hold the agreed role: coordinate, prepare decisions, control change and report.
04 /
Share status, decisions, risks and next actions with the incoming team, through the AD SEN Handover Pack.
05 — Downloads
PDF / Brochure
AD SEN Embedded at a glance: situations, role and terms of an assignment.
PDF / Process
Take over, stabilise, lead, hand over: phase by phase, with deliverables.
PDF / References
Client situation, analysis, intervention and outcome for selected projects.
PDF / CV
International CV. Architect DPLG, France, Southeast Asia and the UAE.
06 — International perspective
For developers, PMCs, consultancies and client-side teams facing a decisive phase on major projects.
Yann Bacquet, Architect DPLG: six years based in Vietnam, a previous assignment in the UAE, 50 feasibility studies including 30 in Vietnam, and some sixty humanitarian projects.
English is the working language for international assignments. On site, hybrid or remote, depending on the mandate.
01 /
Priority focus: Dubai and Abu Dhabi: major programmes, international teams, mobilisation phases.
02 /
Six years based in Vietnam. Southeast Asia as a long-standing field of work.
03 /
A practice rooted in France, in the transformation of existing buildings.
07 — Let’s talk
Describe the situation, the role to cover and your timeline. A first conversation defines the role, scope and duration.
AD SEN Embedded — by AD VITAM
Interim senior architectural & design leadership